Shot Lists and Storyboards Beside the Production Plan
Build detailed shots with camera information and organize visual reference frames without separating coverage planning from the production.
Plan availability
Shot lists are included on Free. Storyboards and expanded planning tools require Pro or higher.
Detailed shot planning
Record shot descriptions, camera angles, movements, lenses, and production notes.
Reference frames
Upload visual references and organize them as a production storyboard.
Production context
Keep coverage planning close to the schedule, files, contacts, and tasks it supports.
Built around the production, not a disconnected generator
A schedule explains when work happens; a shot list explains what the camera needs to capture. CinePlan keeps both in the same production so coverage can evolve alongside scenes, tasks, files, and the shooting schedule.
The workflow at a glance
Detailed shot planning
Record shot descriptions, camera angles, movements, lenses, and production notes.
Reference frames
Upload visual references and organize them as a production storyboard.
Production context
Keep coverage planning close to the schedule, files, contacts, and tasks it supports.
Exportable planning
Use supported exports to move current production information into crew-ready documents.
How this works in CinePlan
- 1
Create the production and identify the scenes or segments that need coverage.
- 2
Add shots with useful camera and movement details.
- 3
Attach or upload reference frames for visual alignment.
- 4
Review the shot plan alongside the schedule before the shoot.
Put this workflow inside your next production
Start free, build the core production, and upgrade when the workflow requires paid tools or additional capacity.
See this feature in context
Use the next resource that matches where you are in the production workflow.
Preview a music video production template
Preview a realistic starter production before creating an account.
See how a practical shot list is built
Use practical production guidance before adapting the workflow.
Crew turnaround calculator
Check the rest window between wrap and the next crew call.